Komparasi Prediksi Penyelesaian Proyek dengan Earned Value dan Earned Schedule
Abstract
Full Text:
PDFReferences
PMI, 2021. Guide to the project management body of knowledge (PMBOK guide). s.l.:Project Management Institute, Inc..
Basar, A., 2020. A novel methodology for performance evaluation of IT projects in a fuzzy environment: a case study. Soft Computing, Issue 24, p. 10755–10770.
Hasan, R., Chowdhury, S. A. & Akter, J., 2021. Journal of Technology Management and Business Construction Project Monitoring: The Cost and Schedule Control by Earned Value Method (EVM). JOURNAL OF TECHNOLOGY MANAGEMENT AND BUSINESS, pp. 1-9.
Jaber, F. K., Jasim, N. A. & Al-Zwainy, F. M., 2020. Forecasting techniques in construction industry: earned value indicators and performance models. Engineering and Environmental Sciences, 29(2), p. 234–243.
KHAMOOSHI, H., I, M. M. & KWAK, Y. H., 2021. PROJECT DURATION FORECASTING. JOURNAL MODERN PM, 09(27), pp. 7-19.
Lipke, W., 2020. Project Duration Increase from Rework. PM World Journal, IX(VI), pp. 1-17.
Lipke, W., 2020. Schedule Performance Impact from Rework. PM World Journal, IX(I), pp. 1-10.
Mahmoudi, A., Javed, S. A. & Deng, X., 2021. Earned Duration Management Under Uncertainty. Soft Computing, pp. 8921-8940.
Mayo-Alvarez, L. et al., 2022. A Systematic Review of Earned Value Management Methods for Monitoring and Control of Project Schedule Performance: An AHP Approach. Sustainability.
Nadafi, S., Moosavirad, S. H. & Ariafar, S., 2019. Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management.
Noviani, S. A. & Rachma, I. N., 2025. Analisis Faktor Penyebab Waste dalam Pendekatan Lean Construction pada Beberapa Kontraktor. AKSELERASI: Jurnal Ilmiah Teknik Sipil, VI(1), pp. 62-68.
Nurevita, M. & Anondho, B., 2020. Validasi Prediksi Durasi Dengan Metode Earned Schedule Untuk Gedung Bertingkat Di Jakarta. Jurnal Mitra Teknik Sipil, 3(2), pp. 237-244.
Rachmawati, F., Mudjahidin & Widowati, E. D., 2024. Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance. International Journal of Construction Management, pp. 213-225.
Sackey, S., Lee, D.-E. & Kim, B.-S., 2020. Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy. E Journal of Civil Engineering, 24(3), pp. 693-702.
Sheikhalishahi, M., Zadeh, S. A., Sardarabadi, A. & Naeimi, S., 2022. Improving Earned Value Management and Earned Schedule by Statistical Quality Control Charts Considering the Dependence between Cost and Schedule. Journal of Quality Engineering and Production Optimization, 7(1), pp. 1-22.
DOI: https://doi.org/10.37058/aks.v7i2.16407
Refbacks
- There are currently no refbacks.
Jurnal ini terindeks oleh:

