Electricity Demand Forecasting In NTT Province For 2024-2034 Using Software Low Emissions Analysis Platform (LEAP)

Vinsensius Ferreri Ramaprilo, Frans James Likadja

Abstract


This study aims to electricity demand forecasting and optimize New Renewable Energy (NRE) to supply electrical energy demand in East Nusa Tenggara (NTT) Province 2024-2034 using Low Emissions Analysis Platform (LEAP) Software, considering factors of population growth, economic growth, and government policies related utilization NRE and environment. The method used is a quantitative descriptive end-use model. High, medium, and low scenarios were added to make the research results more adaptive. Moreover, PLTD and PLTU are scenarios that will experience decreased installed capacity until 2034. The results of forecast electricity demand 2024-2034 in NTT Province, for the high scenario increased from 1,448.49 GWh to 2,018.56 GWh with average growth of 3.50%, medium scenario increased from 1,318.91 GWh to 1,595.31 GWh with average growth of 2.06%, low scenario increased from 1,200.10 GWh to 1,359.33 GWh with average growth of 1.39%. Optimization of NRE in the high, medium, and low scenarios shows that NRE can supply electricity demand until 2034.


Full Text:

PDF (20-33)

References


A. Yumiyanti, E. P. W. Uje, I. Darmawan, N. Aryanto, and D. Maulidyawati, “Analisis Kebutuhan Energi Listrik Kabupaten Sumbawa Di Tahun 2041 Menggunakan Perangkat Lunak Long-Range Energy Alternative Planning System (Leap),” J. Elektron. Energi dan Sist. Tenaga, vol. 1, no. 1, pp. 1–8, 2022, [Online]. Available: http://jurnal.uts.ac.id/index.php/Altron/article/view/1711

M. Yazid, R. Dinzi, and S. Utara, “Perbandingan Metode Gabungan Dan Metode Kecenderungan ( Regresi Linier ) Untuk Prakiraan Kebutuhan Energi Listrik Wilayah Sumatera Utara,” Singuda Ensikom, vol. 11, no. 29, pp. 7–12, 2015.

U. Mubarak, “Fakultas Teknologi Informasi Dan Elektro,” Anal. Proyeksi Kebutuhan Energi List. di Kabupaten Temanggung Berdasarkan Pertumbuhan Beban, 2018.

S. A. Siregar and E. Warman, “Studi prakiraan kebutuhan energi listrik tahun 2013-2017 wilayah kota padang sidimpuan dengan metode gabungan,” Singuda Ensikom, vol. 1, no. 2, pp. 53–58, 2013, [Online]. Available: http://jurnal.usu.ac.id

Suhono and Sarjiya, “Long-term electricity demand forecasting of Sumatera system based on electricity consumption intensity and Indonesia population projection 2010-2035,” Energy Procedia, vol. 68, pp. 455–462, 2015, doi: 10.1016/j.egypro.2015.03.277.

R. Rakka, “Proyeksi Kebutuhan Energi Listrik Di Jawa Tengah Menggunakan Perangkat Lunak LEAP,” pp. 1–7, 2013.

BPS, “Provinsi Nusa Tenggara Timur Dalam Angka 2024,” Kupang, 2024. [Online]. Available: https://ntt.bps.go.id

I. Nurjanah, B. Winardi, and A. Nugroho, “Prakiraan Kebutuhan Energi Listrik Tahun 2016–2020 pada PT PLN (Persero) Unit Area Pelayanan dan Jaringan (APJ) Tegal dengan Metode Gabungan,” Transient J. Ilm. Tek. Elektro, vol. 5, no. 1, pp. 49–55, 2016, [Online]. Available: https://ejournal3.undip.ac.id/index.php/transient/article/view/11887

M. T. Gebre, J. Hwang, and G. Biru, “Electricity demand analysis and forecasting: The case of GADA special economic zone,” Heliyon, vol. 10, no. 3, p. e25364, 2024, doi: 10.1016/j.heliyon.2024.e25364.

D. S. Insani, B. Badriana, and M. Daud, “Analisis Peramalan Kebutuhan Energi Listrik untuk Kabupaten Bireuen Menggunakan Perangkat Lunak LEAP,” J. Nas. Tek. Elektro, vol. 8, no. 1, p. 32, 2019, doi: 10.25077/jnte.v8n1.608.2019.

R. Yang and W. Wang, “Potential of China’s national policies on reducing carbon emissions from coal-fired power plants in the period of the 14th Five-Year Plan,” Heliyon, vol. 9, no. 9, p. e19868, 2023, doi: 10.1016/j.heliyon.2023.e19868.

F. J. Likadja, E. R. Mauboy, and C. M. Leda, “Prakiraan Kebutuhan Energi Listrik Di Provinsi Ntt Tahun 2019-2029 Menggunakan Metode Gabungan Dan Leap,” J. Media Elektro, vol. IX, no. 1, pp. 22–30, 2020, doi: 10.35508/jme.v0i0.2674.

J. M. G. Williams, “Training exercises,” Psychol. Treat. Depress., pp. 213–229, 2020, doi: 10.4324/9780203414903-16.

P. Statistik, “Statistik PLN 2018-2022,” Statistik PLN. [Online]. Available: https://web.pln.co.id/

PLN, “Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT PLN (Persero) 2021-2030.,” 2021.




DOI: https://doi.org/10.37058/jeee.v6i1.12441

Refbacks

  • There are currently no refbacks.



Journal of Energy and Electrical Engineering (JEEE)
Program Studi Teknik Elektro Fakultas Teknik Universitas Siliwangi
Jl. Siliwangi No. 24 Kota Tasikmalaya - 46115
email: jeee@unsil.ac.id
e-ISSN: 2720-989X


INDEXED BY:

     

mallbet login

mallbet login

mallbet login

https://www.articalworld.com/

sakti55