Table of Contents
Articles
BANDINGAN ANALISIS COST BUDGET PLAN MENGGUNAKAN METODE KONVENSIONAL DAN METODE BUILDING INFORMATION MODELING (BIM) 5D DALAM PEKERJAAN STRUKTURAL (Studi Kasus: Proyek Pembangunan Gedung Laboratorium Terpadu Politeknik Negeri Indramayu)
DOI : 10.37058/aks.v5i2.10160
| Abstract views : 293 times |
PDF views : 156 times
Muhammad Lutfi Nur Arifin, Permana Hendrawangsa, Novia Komala Sari
|
|
Kajian Redesign Struktur Gedung 5 Lantai Balai Pengobatan Universitas Siliwangi
DOI : 10.37058/aks.v5i2.10155
| Abstract views : 133 times |
PDF views : 147 times
Mohammad Syarif Al Huseiny, Rosi Nursani
|
|
ANALISA MOTIVASI PEKERJA KONSTRUKSI DI KOTA TASIKMALAYA
DOI : 10.37058/aks.v5i2.10137
| Abstract views : 113 times |
PDF views : 55 times
agi rivi hendardi, Dicky Nurmayadi
|
|
Analisis Tingkat Kepuasan Penumpang Bus Efisiensi Terhadap Kualitas Dan Kenyamanan Rute Purwokerto-Yogyakarta
DOI : 10.37058/aks.v5i2.10044
| Abstract views : 146 times |
PDF views : 83 times
Hanief Attalah Putra Riyanto, Juanita Juanita, Cremona Ayu Novita Sari
|
|
TINJAUAN PERBANDINGAN METODE PEMBEBANAN STRUKTUR BANGUNAN ATAS JEMBATAN BETON BERTULANG
DOI : 10.37058/aks.v5i2.10189
| Abstract views : 297 times |
PDF views : 259 times
Yunita Mauliana, Frans Wahyu Saputra
|
|
Analisis Sistem Drainase RSUD Dr. Soekardjo Kota Tasikmalaya
DOI : 10.37058/aks.v5i2.10205
| Abstract views : 136 times |
PDF views : 73 times
Michael Tantoh, Anri Noor Annisa Ramadan, Agi Rivi Hendardi
|
|
UPAYA MITIGASI KELONGSORAN LERENG PADA JALUR PIPA PENSTOCK EKSISTING
DOI : 10.37058/aks.v5i2.10213
| Abstract views : 89 times |
PDF views : 81 times
Asrinia Desilia, Fritz R.P.Nababan, Zakwan Gusnadi
|
|
PREDIKSI DEBIT ANDALAN DAS CILOSEH MENGGUNAKAN FJ MOCK DAN BANGKITAN DATA DEBIT THOMAS FIERING UNTUK ANALISA KETERSEDIAAN AIR DEARAH IRIGASI CIMULU
DOI : 10.37058/aks.v5i2.10234
| Abstract views : 478 times |
PDF views : 195 times
Pengki Irawan, Junaedi Setiawan, M. Wildan Alfaridzi, Shinta Awaliyah, Asep Kurnia Hidayat, Hendra Hendra
|
|