PERANCANGAN DAN ANALISA KELAYAKAN PEMBANGUNAN SISTEM PHOTOVOLTAIC BERKAPASITAS 60 KWP DI PEMBANGKIT PEMARON
Abstract
Full Text:
PDFReferences
Bien, LE, dkk., “Perancangan sistem Hibrid Pembangkit Listrik Tenaga Surya Dengan Jala-Jala Listrik PLN Untuk Rumah Perkotaan,” Jakarta: Teknik Elektro Universitas Trisakti, 2008.
Hankins, Mark, “Stand-Alone Solar Electric Sistems. London: Earthscan,” 2010.
Papadopoulou, Elena V.M., “Photovoltaic Industrial Sistems,” Berlin: Springer, 2011.
Asim M. Widatalla, Heimo Zinko, “Designing a Photovoltaic Solar Energy Sistem for a Commercial Building Case Study: Rosa Park Hotel in Khartoum-Sudan,” World Renewable Energy Congress-Sweden, 2011.
Muhammad Hariansyah. “Studi Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Kapasitas 25 kWp” 2009.
Washington State University Extension Energy Program,” Solar Electric Sistem Design, Operation and Installation,” 2009.
International Finance Corporation. “Utility-Scale Solar Photovoltaic Power Plants,” Washington, D.C., 2015.
DOI: https://doi.org/10.37058/jeee.v3i2.4715


